With less than a month to go before Berlin’s new airport opening, it was revealed that it wasn’t ready to go. The delay is now rumored to stretch into 2013. This is hugely problematic since the new airport was replacing two separate airports with much greater capacity. Air Berlin and Lufthansa had ramped up their operation significantly and now they’re going to have to backtrack on that. How bad is it? Discuss.